|
Customer Case Study 1
|

|
|
After finishing his final
grading the home owner called the survey company that the builder used to
provide the rough grade certificate. They ask for $360 and a waiting time
of 3 weeks. After
finishing the survey, the city inspector stated in his report that the
final grade needs major modification and requires another survey. The
survey company asked the home owner for another $360 to do another survey.
In addition to doing the
survey and the grade certificates, S-Cubed Engineering point’s out to the
home owner the grades that need to be fixed, so that they can be fixed
before the city inspector does his visual inspection. If the city inspector states that
another survey is needed then S-Cubed will do the second survey for FREE.
|